China Wholesale Plastic Extrusion Blow Mold - rope locker mold – Euro Mold
Short Description:
China Wholesale Plastic Extrusion Blow Mold - rope locker mold – Euro Mold Detail:
Quick details:
Product name: | Rope locker mold | Mold type: | Injection mold | Processing machines: | Lathe, milling, carving, drilling, etc |
Part material: | PP / PA66 | Cavity No.: | 1 cavity ~ multi-cavity | Design software: | Pro-E, UG, CAD, solidworks |
Brand name: | EURO | Mold base: | LKM standard or self-made | Mold life: | > 3,000,000 shots |
Place of origin: | Zhejiang, China | Core & cavity material: | H13, 718H | Runner: | Cold runner |
Packing & delivery:
Package: | Standard sea-worthy packing wt wooden boxes or polywood boxes |
Delivery: | T1 time 45 working days after confirmation on 3D mold drawings and confirmation on receipt of deposit payment |
Main market:
Europe, North America, South America
Competitive advantage:
- 1.Team of experts with extensive knowledge in the line
- 2.Optimal mold design for steady performance and shorter cycle time.
- 3.Quality mold material for better mold life (only genuine material is applied)
- 4.Standard mold parts for easier maintenance
- 5.Good processing machines for tight tolerance molds
- 6.Closely work with clients and keep on communication
Product detail pictures:
Related Product Guide:
5 Tips to Prevent Household Mold Growth
How to Get Rid of Household Mold
We have state-of-the-art equipment. Our products are exported for the USA, the UK and so on, enjoying a fantastic status among the clients for China Wholesale Plastic Extrusion Blow Mold - rope locker mold – Euro Mold, The product will supply to all over the world, such as: Philadelphia , Milan , Myanmar , We are committed to meet all your needs and solve any technical problems you may encounter with your industrial components. Our exceptional products and vast knowledge of technology makes us the preferred choice for our customers.
By Darlene from Mongolia - 2015.05.15 10:52
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Dinah from Singapore - 2015.11.11 19:52